UL CERTIFIED
Flex Tape Flood Protection
Flex Paste Flood Protection
Flex Seal & Flex Seal Liquid Flood Protection

Kits de Protección contra Inundaciones

Removable, waterproof products that help stop low-level floodwater.

$99.99
$99.99
Option: Multipurpose Kit
Please be advised: Due to warehouse scheduling, this item will not ship until January 4, 2026. We apologize for any inconvenience and thank you for your understanding.

La familia de productos de protección contra inundaciones Flex Seal está diseñada específicamente para trabajar JUNTOS para crear múltiples capas de protección impermeable y súper resistente, y para ser fácilmente removidos después de que las aguas de inundación retrocedan. Pueden ayudar a ralentizar o incluso detener el ingreso de agua a las estructuras.

*El Kit Multipropósito de Protección contra Inundaciones puede enviarse por separado de otros productos Flex Seal.

How To Use Flood Protection Starter Kit

For complete instructions go to: flexsealproducts.com/flood

Read entire label for directions and warnings before use.

• Protective gloves, clothing, and eyewear are recommended.

• Apply to the exterior of the structure.

• Area being sealed must be clean, dry, and free of grease, oil, and dirt.

Flood Protection Paste

• Unscrew nozzle, cut the nub on the cartridge, being careful not cut or damage threads.

• Screw nozzle back on cartridge and cut nozzle to the desired thickness of the bead.

• Place the cartridge into the caulking gun.

• Using a smooth motion, apply an even bead directly to the areas being sealed.

• Use your finger or tool to push the bead into the surface being sealed (gloves recommended).

• Apply additional coats after 2-6 hours or when dry to the touch.

• Additional coats should overlap and be wider than previous coats.

• Material can be tooled for approximately 10 to 15 minutes before curing begins.

• Allow approximately 24 to 48 hours to fully cure before floodwaters arrive.

Flood Protection Liquid

• Stir well before use, do not shake.

• Brush, roll, or pour several even coats anywhere water may enter.

• Apply additional coats after 3-6 hours or when dry to the touch.

• Additional coats should overlap and be wider than previous coats.

• Allow approximately 24 to 48 hours to fully cure before floodwaters arrive.

REMOVAL

Grab a small portion of material from an edge and pull away from the structure. Using a small pair of pliers may be necessary. If any residue is left on the surface, use a stiff nylon brush, paper towel or rag with denatured alcohol to clean the area.

OFTEN PURCHASED WITH

VIEW ALL